Principality Building, Cardiff
15 Jul 2005
Problem: In order to comply with Disability Laws, the client needed to install a disabled access. Their perimeter fence line is made of architectural glass gates that were unsuitable for modification.
Solution: Design, manufacture and installation of two gate leaves with under-floor operators. Cladding was produced in glass to match the rest of the fence line and disabled access was integrated with the client’s access control and intercom systems.
_____